News
Another step forward
Print

Another step forward

In April ‘13 DNEPROHYDROMACH signed a contract with JSC "Magnitogorsk Iron & Steel Works" (Russia) on the supply of modern hydraulic cast house equipment for the reline of BF-6.

 

The Blast furnace 6 reline is the beginning of a radical modernization and technical re-equipment of the legendary Russian Iron & Steel Works. In determining the executors of the this project technical and commercial departments of the plant have put a lot of work to study experience of design, construction and operation of modern cast house hydraulic equipment in Russia, Ukraine and the European Union.

 

Choice made by the Magnitogorsk Iron & Steel Works can be considered as an indication and recognition of the high level of technical achievement of DNEPROHYDROMACH in developing modern technological equipment for the blast furnaces.